CSE
Rigging

  • SC&RA Awards
    • Zero Accidents
       Transportation Award
    • Zero Accidents Rigging Award
    • Trained Master Riggers
    • Engineered Project Plans

    Specialty Rigging Equipment

    • 450-Ton Gantry System
    • Jack and Slide System
    • 600-Ton Unified Jacking System
    • 45-Ton Tri-Lifter


  • 131,000 lb. turbine delivered in horizontal
    position, uprighted upon arrival and moved in
    hydro-station, then unloaded from lowboy with
    an overhead crane.
    .



  • 350,000lb Press Installation
    Duration of project: 4-Days.
    Press was delivered by rail to rail site. Jacks and slides were used to unload/load the press and transported to the plant by Hydraulic Platform Trailer. We unloaded, rotated, and transported the press inside the plant utilizing 2 cranes and trailers. Press was installed using 450 ton gantry system and reassembled for operation.


  • CSE has installed hundreds of overhead Cranes ranging in size from 2 ton –100 ton for various manufactures and plants.
    Our specialized lifting equipment allows CSE to make complicated installations safe and efficient with minimum disruption to your operational productivity.

  • Equipment installation is a staple part of CSE’s rigging division. We can install a single piece of equipment or relocate and install complete plant operations.