SC&RA Awards
• Zero Accidents
Transportation Award
• Zero Accidents Rigging Award
• Trained Master Riggers
• Engineered Project Plans
Specialty Rigging Equipment
• 450-Ton Gantry System
• Jack and Slide System
• 600-Ton Unified Jacking System
• 45-Ton Tri-Lifter
131,000 lb. turbine delivered in horizontal
position, uprighted upon arrival and moved in
hydro-station, then unloaded from lowboy with
an overhead crane. .
350,000lb Press Installation
Duration of project: 4-Days.
Press was delivered by rail to rail site. Jacks and slides were used to unload/load the press and transported to the plant by Hydraulic Platform Trailer. We unloaded, rotated, and transported
the press inside the plant utilizing 2 cranes and trailers. Press was installed using 450 ton
gantry system and reassembled for operation.
CSE has installed hundreds of overhead Cranes ranging in size from 2 ton –100 ton for various manufactures and plants.
Our specialized lifting equipment allows CSE to make complicated installations safe and efficient with minimum disruption to your operational productivity.
Equipment installation is a staple part of CSE’s rigging division. We can install a single piece of equipment or relocate and install complete plant operations.